Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 14 results ...

AbouRizk, S M, Halpin, D W and Wilson, J R (1991) Visual Interactive Fitting of Beta Distributions. Journal of Construction Engineering and Management, 117(04), 589–605.

Abudayyeh, O Y and Rasdof, W J (1991) Design of Construction Industry Information Management Systems. Journal of Construction Engineering and Management, 117(04), 698–715.

Bernold, L E and Treseler, J F (1991) Vendor Analysis for Best Buy in Construction. Journal of Construction Engineering and Management, 117(04), 645–58.

  • Type: Journal Article
  • Keywords: Management; Construction materials; Procurement; Quality control; Construction management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1991)117:4(645)
  • Abstract:
    It has been generally recognized that the construction industry needs to improve its efforts in managing the construction material. Studies have shown that the lack or mishandling of construction material can cause loss in productivity, resulting in money wasted. Such unnecessary expenses could be drastically reduced if more emphasis were given on properly managing the consumable and nonconsumable material from the design stage to its final use in the building process. A crucial step in any construction project is the acquisition of the needed material, both bulk and engineered. The quality of the delivered material, the timeliness of the shipments, etc., can far outweigh the importance of the purchasing price. Poor quality may require extensive rework, while late shipments may delay activities on the critical path. Thus, the selection of the proper vendor is very important for the overall performance on the construction site. This paper presents a vendor analysis system that is based on the best‐buy concept. It is demonstrated how the purchasing department's perception of a best buy differs from the priorities of a construction manager. A detailed comparison highlights these differences.

Cole, L J R (1991) Construction Scheduling: Principles, Practices, and Six Case Studies. Journal of Construction Engineering and Management, 117(04), 579–88.

De La Garza, J M and Mitropoulos, P (1991) . Journal of Construction Engineering and Management, 117(04), 736–55.

De La Garza, J M, Vorster, M C and Parvin, C M (1991) Total Float Traded as Commodity. Journal of Construction Engineering and Management, 117(04), 716–27.

de Neufville, R and King, D (1991) Risk and Need‐for‐Work Premiums in Contractor Bidding. Journal of Construction Engineering and Management, 117(04), 659–73.

Kakoto, T and Skibniewski, M (1991) Engineering Decision Support of Automated Shield Tunneling. Journal of Construction Engineering and Management, 117(04), 674–90.

Moselhi, O, Hegazy, T and Fazio, P (1991) Neural Networks as Tools in Construction. Journal of Construction Engineering and Management, 117(04), 606–25.

Reinschmidt, K F, Griffis, F H ( and Bronner, P L (1991) Integration of Engineering, Design, and Construction. Journal of Construction Engineering and Management, 117(04), 756–72.

Riggs, L S and Hills, J W (1991) Implications for U.S. Construction Companies in 1992 European Community. Journal of Construction Engineering and Management, 117(04), 773–90.

Rowings, J E (1991) Project‐Controls Systems Opportunities. Journal of Construction Engineering and Management, 117(04), 691–7.

Sanders, S R and Thomas, H R (1991) Factors Affecting Masonry‐Labor Productivity. Journal of Construction Engineering and Management, 117(04), 626–44.

Touran, A (1991) Modeling Uncertainty in Operations with Nonstationary Cycle Times. Journal of Construction Engineering and Management, 117(04), 728–35.